The Construction

The towers were phased into operation between 1958 and 1960.

By the spring of 1955 Bethlehem Steel had completed the first platform at its Quincy, Massachusetts facility. The steel platform was shaped into an equilateral triangle with cropped ends, measuring 210 feet along all three sides, providing about half an acre of surface area. So that it would conveniently house programmed personnel and equipment, combined with stores, reserves, and spare parts essential for long-term stays, the platform was welded into a self contained, compartmentalized unit 20-feet high, subdivided into separate decks. The bottom-most deck was employed mainly for maintenance and storage space, where tanks and pumps were located. The next deck was partitioned into living quarters, a galley and mess hall, administrative offices, heating and air conditioning areas, recreational areas, food storage space, a dispensary and library. Atop this, across approximately half the wedge-shaped platform, was the helicopter landing area. Occupying the rest of the triangle was the uppermost operations deck, some 210 feet long by 60 feet wide, rising 12 feet above the rest of the 20-foot high platform. Inside this deck was the surveillance and control operations area, on top of which would be perched the three radar antennas enveloped by pressurized arctic towers. Equipped with radars and other gear, the platform, weighed 6,500 tons or so.7

Transporting the first platform from shore to site was a toilsome task. There was trouble enough launching it into water, let alone hauling it to sea. Yet, by June 1955, it was successfully floated and fitted for its sea voyage. Responsibility for towing it to site and then erecting it, was vested in the Raymond and De Long Companies, who embarked with their charge on 12 July 1955. Within two days time, they arrived on site. Hereupon, temporary legs were dropped to the shoal (about 55 feet under water); the tower platform was jacked up to rest on the temporary legs high above the water, while the three permanent legs, or caissons were readied. Each of the three tubular legs was designed for lasting support, measuring over 160 feet long, the first 48 or so feet of which were ensconced snugly into the shoal, the middle 55 feet of which remained immersed in water, and the top 60 or so feet of which rose above the water’s surface, lifting the platform high and out of harm’s way. The legs were versatile enough to be logistically, as well as architecturally purposeful. For inside each steel leg was incased a 140-foot long steel tube six feet in diameter where thousands of gallons of fluid reserves, mostly water and fuel oil, might be stored, surrounded by a jacket of concrete over two feet thick. One of the three hollow legs contained seawater tapped for conversion to drinking water. To this end, distillation equipment was included for producing several gallons of fresh water per minute.8

By the end of 1955, TT-2 was assembled, with bolts tightened and the rest shipshape enough for USAF to assume beneficial occupancy. This it did, effective 2 December 1955. The FPS-3A and twin FPS-6 height radars, as programmed, were brought aboard and installed. They detected targets of B-47 size, flying about 50,000 feet, up to 200 nautical miles away. But the same targets flying at low altitudes say 500 feet—because of line-of-sight radar characteristics, were discernible by radar only up to 50 nautical miles away. It was for this reason, among others, that airborne early warning and control (AEW&C) aircraft later patrolled certain off-shore stations to cover low-altitude radar gaps over looked by Texas Towers, picket vessels, and shore-based radars.9

Along with the radars arrived the communications equipment, without which Texas Towers, being unable to transmit their findings to shore, would be incapacitated. Foremost among this equipment came the point-to-point, FRC-56 tropospheric scatter system. Three parabolic-disk antennas, measuring 28 feet in diameter, were mounted vertically, side by side, along the platform edge supporting the operations deck. Two at a time were utilized for transmitting messages, while all three combined received them. The signals were deflected from the tropospheric layer of Earth’s atmosphere, between the 30,000 and 60,000-foot level. A wide spectrum of ultra-high frequencies was thus exploitable without recourse to expensive intermediate relay stations. Normally unaffected by atmospheric disturbances, the tropospheric scatter radio system worked well in the manual system for distances up to about 200 miles, and was intended to serve equally as well for automated SAGE communications later to come. At either end of the system, telephone circuits were patched in so that voice communications could be reliably maintained.

Apart from this primary point-to-point system, there was installed conventional BF radio equipment for tower-to-shore backup communications, and UHF and VHF radio equipment for tower-to-air communications. Teletype, cryptographic, telephonic intercommunications and public-address systems were incorporated as well, together with certain aircraft radio navigational devices. GPA-37 equipment was integrated to facilitate weapons control operations. To power the communications, navigation and radar equipment thus brought aboard, eleven 250 KW diesel generators were rigged so that less than half of them, operating in unison, would supply sufficient electricity during any given time. Air conditioning units were furnished to prevent certain of the equipment from over-heating.10

Site P-10 (762 ACW Squadron) at North Truro AFS, Massachusetts, was designated the parent station for TT-2. Operational concepts governing their relationships were diligently spelled out in a full-dress operations plan, first published by ADC in July 1954, later revised in July 1956. Other matters were carefully worked out, such as methods for transportation and supply. Two H-21B helicopters per tower were authorized by USAF, four of which were based at Otis AFB and two, at Suffolk County AFB. The twin-rotor H-21B had a theoretical capacity for carrying 10 passengers or 2,000 pounds of freight. When equipped with necessary flotation and survival gear, however, the H-21B’s capacity was cut to eight persons or 1,550 pounds of freight. Other cargo, particularly POL, was furnished periodically by ship. Fuel, food and lubricants,were stocked to provide at least a 30-day reserve; spare parts were on hand for operational equipment to last 45 days On 7 May 1956, TT-2 achieved the status of a limited operationally ready aircraft control and warning station. For purposes of furnishing logistical support for TT-2, and for the others when the need arose, the 4604 AC&W Squadron (Texas Towers) was activated 8 October, 1956 at Otis AFB, Massachusetts, which two months later (December 1956), was re-designated the 4604th Support Squadron (Texas Towers).11

Texas Towers 3 and 4. Meanwhile, by November 1955, bids for the next two towers had been accepted. Construction contracts for both of them were awarded J. Rich Steers, Inc. of New York City in collaboration with Morrison-Knudsen, Inc., of Boise, Idaho. Except for minor changes (including longer legs and increased storage capacity for diesel oil), these two practically duplicated the configuration and basic arrangement of TT-2.

Because of future commitments to integrate Texas Towers into upcoming SAGE centers during the late 1950’s, ADC picked TT-3 at Nantucket Shoal, and TT-4 at Unnamed Shoal, for its next two towers. This left only TT-1 (Cashes Ledge) and TT-5 (Brown’s Bank) unaccounted for. USAF, for purposes of economizing, was anxious to rid the program of them both.

At first, ADC resisted all attempts in this direction. Then, in late 1956, because of the promise of increased off-shore radar coverage by coastal AC&W squadrons in the vicinity, where TT-1 and TT-5 were scheduled to go, ADC agreed to drop TT-1 and TT-5 from all further consideration, leaving three towers, TT-2,TT-3 and TT-4, in the program.12

In 1956 and 1957, work proceeded on TT-3 and 4. Platform and legs of TT-3 were readied by mid-1956, launched the night of 7 August 1956, and towed to Nantucket Shoal and erected that same month. On 29 November 1956, ADC assumed beneficial occupancy. Next month the superstructure and main supports of TT-4 were under construction at South Portland, Maine. These were completed by mid-1957, then, starting 28 June 1957, were towed to sea and placed at Unnamed Shoal. ADC gained beneficial occupancy in November 1957.

The New Life. During these same years (1956-1957), personnel serving at TT‑2 — then functioning manually on a limited operational status—were learning of peculiarities uniquely associated with Texas Tower duty. For one thing, the metal superstructure seemed to vibrate constantly. As the FPS-20A long-range radar antenna (converted from the original FPS-3A model), continued unceasingly to spin (except when out of commission for maintenance), the diesel generators, to grind out their power, and the other equipment, to crank away at their appointed tasks, TT-2 rattled vibrantly from the ordeal. Standing like a three-pronged tuning fork, the tower resonated with noises that spread farther, and amplified greater, than initially occasioned by their source. Matters were not improved when, every half-minute or so during the frequent fogs, the dismal-sounding foghorn croaked out its forlorn message.

Still worse, since it affected operations, was the phenomenon of temperature inversion suffered mostly in summertime. This caused loss of radar coverage, creating, in certain instances, permanent echoes that obscured or distorted radarscope reception. On occasion, equipment components generated electromagnetic disturbances that interfered with, or disrupted, operations of other electronics apparatus. Notwithstanding these and other shortcomings, tower crews became inured to those problems not susceptible of change. And TT-2, effective 17 April 1958, became fully operational manually, then in September 1958, operational as a SAGE unit. TT-3 followed suit in October 1958. TT-4, in mid-April 1959, was declared manually operational, and in April 1960, SAGE operational. Cost of the towers, including platform, legs, radars and communications equipment was reckoned at around $13 million each, and with operating expenses figuring about $1.5 million annually thereafter. TT-3 reported to, and comprised an annex of the 773rd AC&-W Squadron (Montauk, New York); TT-4, the 646th AC&W Squadron (Highlands, New Jersey).13

Texas Tower #2

TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4  TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4 TexasTower#4

Texas Tower #3

TexasTower#4

Texas Tower #4

TexasTower#4 TexasTower#4  TexasTower#4 TexasTower#4

The Texas Towers in the waters off New England. With 50 KW-CW, 900 MHz power amplifiers for tropospheric scatter communications, the Texas Towers were a product of the 1950s and a building block for UHF television. Credit: Photo courtesy of Doc Ewen.

[Texas Towers 10 KW UHF power amplifier]

The Texas Towers 10 KW UHF power amplifier. The name on the Texas Tower transmitter is National-Ewen Knight. Ewen Knight built the first high power transmitters for Lincoln Lab. Credit: Photo courtesy of Doc Ewen.

[Klystron UHF power amplifier tube in socket]
The Texas Towers klystron UHF power amplifier tube in socket. Credit: Photo courtesy of Doc Ewen.

Hit Counter